Pelco Blower HB6000 220 User Manual

®
HB6000, HB6000/220, and  
HB6024  
Heater/Blower Kits  
Installation/Operation  
Manual C496M (12/90)  
2.0 SCOPE  
1.0 WARNINGS  
The information within this manual covers the installa-  
tion of the HB6000, HB6000/220, and HB6024 Heater/  
Blower Kits.  
Priortoinstallationanduseofthisproduct,thefollowing  
WARNINGS should be observed.  
1. Installation and servicing should only be done by  
Qualified Service Personnel and conform to all  
Local codes.  
3.0 DESCRIPTION  
The HB6000 (120 VAC), HB6000/220 (230 VAC), and  
the HB6024 (24 VAC) are field installed heater/blower  
kits for the HS1000 and HS6000 series high security  
enclosures. These heater/blower kits will help stabilize  
the internal enclosure temperatures when the enclosures  
are subjected to more extreme conditions.  
2. Installation should be in accordance with all  
applicablelocalandnationalelectriccodes,utilizing  
approve materials only.  
3. OnlyusereplacementpartsrecommendedbyPelco.  
The heaters provide 80 watts of heat thermostatically  
controlled to turn ON at 40°F (4.44°C) and OFF at 60°F  
(15.56°C).  
Please thoroughly familiarize yourself with the informa-  
tion in this manual prior to installation and operation.  
(800) 289-9100 or (1-559) 292-1981 • FAX (800) 289-9150 or (1-559) 292-3827  
International customers call (1-559) 292-1981 or FAX (1-559) 348-1120  
 
4.2 BLOWER/PCB ASSEMBLY  
3.4 POWER REQUIREMENTS  
1. Open the cover or access door(s).  
The blower and heater require a 24 VAC/120 VAC/230  
VAC, 50/60 Hz single phase power source. They use  
the following wattage when in operation.  
2. On the HS1000, the blower/PCB bracket is de-  
signed to attach to any two (2) adjacent studs re-  
taining the bottom plate. On the HS6000, the  
blower/PCB bracket is designed to attach to the  
two (2) studs at the bottom of the window.  
Blower:  
Heater:  
4.5 watts  
80 watts  
4.0 INSTALLATION  
3. On the HS1000, remove any two (2) adjacent nuts  
and washers retaining the bottom plate to the  
mounting frame. On the HS6000, remove the nuts  
and washers retaining the bottom of the window.  
To install the HB6000, HB6000/220, and HB6024 per-  
form the following steps. Refer to Figure 1.  
4.1 HEATER ASSEMBLY  
4. Place the blower/PCB bracket over the studs and  
replace and tighten the hardware  
1. Open the cover or access door.  
2. The heater brackets are designed to attach to two  
(2) adjacent studs retaining the window.  
3. Remove any two (2) adjacent nuts and washers  
(preferably at the bottom of the window) on both  
sides of the window.  
4. Place the heater brackets on the studs, heaters  
angled away from the window, and replace and  
tighten the hardware.  
Figure 1. HB6000, HB6000/220, and HB6024 Assembly  
Pelco Manual C496M (12/90)  
3
 
4.3 HEATER/BLOWER WIRING  
4.4 ELECTRICAL CONNECTION  
The blower is factory wired to the PCB assembly.  
After the cable has been routed, all wire connections  
should be made (i.e., video, lens, camera power, heat-  
ers). A 6-position terminal block has been provided to  
assist in this.  
Connect the heaters to the PCB assembly as shown in  
the respective wiring diagrams (refer to Figure 2, Fig-  
ure 3, or Figure 4).  
CAUTION: When using a single power  
source for both the camera and accessories, the  
camera power consumption must be taken into  
consideration when determining the wire gauge.  
Also, make certain that all electrical connec-  
tions are done properly and meet electrical  
codes.  
SupplyAC line voltage (230 VAC, 120 VAC, or 24 VAC)  
as shown.  
Figure 2. HB6000/220 Heater/Blower Kit Wiring Diagram (230 VAC)  
4
Pelco Manual C496M (12/90)